BSB Submission to the 100-Day Review of Brisbane 2032 Games Infrastructure
January 20, 2025Ā ā Community, Featured
As the peak advocacy body dedicated to the advancement of the wider South Bank precinct and its members, Business South Bank (BSB) submissionās to the Games Independent Infrastructure and Coordination Authority (GIICA) 100-Day Review reflects the principles of Vision South Bank.
The submission highlights the unique role the wider South Bank precinct can play in the success of the Brisbane 2032 Olympic and Paralympic Games.
BSB focused on addressing the reviewās objectives of Access, Connectivity, and Integration with the following recommendations:
- Reinforcing the precinct as Brisbaneās hub of activity
- Enhancing walkability
- Leveraging the wider precinctās strengths
Read the full submission – Click here



